Project Optimization
&
Schedule Optimization
Are you a Design-Build firm, Consulting Engineering company, Home Builder, Manufacturer,
Industrial Maintenance department, Construction company, Contractor, Project Owner,
Accounting or Law firm?
Are you working with capital projects or on-going scheduling tasks worth over $500K?
Do you use an ERP or MRP system, or either Microsoft Project*, Primavera P3*
or SureTrak* project management software?
If you answered "yes" to any of the above questions, then you should view our demo! Based on our customer's experiences and their data, cost savings of between 6% to 40% of the total variable costs are achievable by using our project optimization software (for either project optimization or schedule optimization) as compared to schedules developed using traditional forward scheduling rule.
10 minutes is all our demo takes to show you the time and capital savings we can obtain by optimizing a real-world sample project for either lowest cost, minimum time, or a blend of both. Other business objectives of the optimization process are also available.
Our software represents a major breakthrough in project scheduling. It delivers a patent-pending advanced technical solution with compelling return on investment and unparalleled ease of use. Fully automatic, it has shown that it produces results that are significantly better than either the critical path method or rule based scheduling systems. If you're involved with project scheduling, then check out our project optimization software and the benefits it can provide.
Major Benefits:
Works with multiple project management platforms: Microsoft Project*, Primavera P3* and SureTrak*.
The schedule can be seen in all the forms available in the project management software being used.
User can use all team collaboration and reporting tools available in the project management
platform they use.
Gives much better results than Critical Path Method.
Respects all constraints.
Totally automatic. No need to drag and drop.
Dramatically improves the effectiveness of the human scheduler.
Can optimize for any given business objective.
Links the operating objective with the business objective directly.
Very rapid scheduling engine.
Realistic modelling of costs, such as resource costs, fixed costs, overhead costs, interest costs,
moving costs, opportunity and lateness costs.
Realistic modelling of resources, such as alternative resources and alternative capacities.
Provides task wise cost information which is used by contractors to identify "best practices."
Call me, Adrian Brookes, for further information, or to arrange a working demo.
AB Technology Group
Tel: 905-448-3528
* Trademarks of their respective owners